Phase 2: Tactical Planning + Critical Transfer
In brief: Transforms User Stories into exhaustive technical implementation plans via LLM. The team validates during Critical Transfer—DC²’s most important meeting.
Why This Phase Is Critical
The problem without Phase 2: The team begins coding with a fragmented understanding of the architectural vision. Misunderstandings surface late (Phase 4-5), requiring costly and unexpected refactoring.
The solution provided: Critical Transfer detects and resolves misunderstandings BEFORE the first line of code is written. Shared and validated architectural vision. Designer-team alignment is verified.
LLM limitations addressed:
- Complex semantic dependencies: LLM forces complete articulation of interfaces, implementation sequences, and component relationships
- No operational memory: Tactical plan becomes the persistent “external memory” consulted in subsequent phases
Link with Agile
Phase 2 = Story Refinement + Sprint Planning.
Instead of decomposing User Stories from scratch during refinement, the team starts with a detailed technical plan pre-generated by the LLM that it can critique, improve, and validate. Same decomposition quality, far less time, more exhaustive plan.
graph TD
US[User Story from PO] --> P1[Phase 1: Architecture Vision]
P1 --> P2A[Phase 2A: LLM generates Plan]
P2A --> C1[Component 1]
P2A --> C2[Component 2]
P2A --> C3[Component 3]
C1 --> P2B[Phase 2B: Critical Transfer]
C2 --> P2B
C3 --> P2B
P2B --> V[Team validates and approves]
style US fill:#fbbf24
style P2B fill:#ef4444
style V fill:#10b981
Example of integration into a typical Sprint:
- Week before: PO presents User Stories, Designer performs Phase 1
- Day 1 Sprint: Phase 2A (morning) + Team pre-reads (afternoon)
- Day 2 Sprint: Phase 2B (Critical Transfer) = Technical Sprint Planning
Process
Inputs:
- Strategic Architecture Document (Phase 1)
- Prioritized User Stories from Product Backlog
- Technology stack standards and team preferences
- Timeline requirements and external dependencies
- Quality standards and testing requirements
Part A: Tactical Plan Generation ⏱️
1. LLM Generation (LLM 90%, Designer 10%)
- LLM reads strategic architecture document
- Generates detailed implementation roadmap
- Decomposes solution into approximately 3-5 components with specifications
- Designer validates alignment with Phase 1 decisions
2. Team Pre-Reading
- Team receives generated tactical plan
- Each member reads individually
- Notes questions, concerns, identified risks
- Prepares preliminary effort estimates
Part B: Critical Transfer ⏱️⏱️⏱️
3. Presentation (~20 min - Designer)
- Designer presents architectural vision
- Explains decomposition into components
- Justifies major technical choices
4. Active Challenge (~40-60 min - Team)
- Team asks questions, challenges assumptions
- Identifies gaps, missing dependencies, risks
- Validates effort estimates
- Discussion of technical feasibility
5. Collaborative Revision (~20 min - Team + LLM)
- LLM incorporates feedback into revised plan
- Generates summary of decisions
6. Final Validation (~10 min - Designer + Team)
- Review revised plan
- Formal approval for Phase 3 transition
- Plan recorded in version control
Outputs:
- Tactical plan approved by Designer and Team
- Detailed specifications per component (I/O, responsibilities, dependencies)
- Defined and justified technology stack
- Aligned effort estimates
- Documented risks and dependencies
Definition of Done
This phase is considered complete when:
- The tactical plan decomposes the solution into ~3-5 implementation phases with clear milestones
- Each component has detailed specification (inputs, outputs, responsibilities, dependencies)
- Technology stack is defined with justification of framework and library choices
- Dev team has reviewed the plan, and all concerns are documented and resolved
- Effort estimates are aligned between designer and team (variance < 20%)
- All external dependencies are identified (APIs, data sources, third-party systems)
- Designer and Product Owner approve the final plan before Phase 3
Going Further
See concrete examples, prompts, and detailed templates
Complete Example: User Story → Tactical Plan
Initial User Story (Product Owner)
As a user,
I want to see prediction confidence with each result
So that I can evaluate the reliability of recommendations
Acceptance Criteria:
- Confidence score 0-100% displayed clearly
- Explanation of factors influencing confidence
- Visual indicator (green/yellow/red) according to level
Phase 1: Architecture Vision (Designer)
Decision: Place confidence logic in business layer, integrate with existing recommendation pipeline. ADR: Sample size penalty to avoid overconfidence.
Phase 2A: Tactical Plan Generated (LLM)
Decomposition into 3 components:
Component 1: confidence_calculator
- Responsibility: Calculate raw confidence score with penalties
- Inputs:
weighted_presence: float- Sum (similarity × presence)total_similarity: float- Sum of similarity scoresn_contributors: int- Number of contributor itemstop_k_similar: int- Target count (typically 5)
- Outputs:
confidence_score: float- Score [0, 1]
- Dependencies: None (pure module, testable in isolation)
- Algorithm:
- Calculate raw confidence: weighted_presence / total_similarity
- Sample size penalty: min(n_contributors / top_k, 1.0)
- Statistical penalty if n < 3: 0.5 + (n / 6.0)
- Return: confidence × penalties
Component 2: confidence_explainer
- Responsibility: Generate explanation of confidence factors
- Inputs:
confidence_score: floatn_contributors: inttop_k_similar: int
- Outputs:
explanation: str- Explanatory textfactors: List[str]- List of key factors
- Dependencies: None
- Logic:
- If n < 3: “Very small sample, reduced confidence”
- If n < top_k: “Limited data, {n}/{top_k} sources”
- If score > 0.8: “Strong confidence, many concordant sources”
Component 3: confidence_presenter
- Responsibility: Format for UI (color, text)
- Inputs:
confidence_score: floatexplanation: str
- Outputs:
display_data: Dict- {score_percent, color, label, explanation}
- Dependencies: None
- Color mapping:
- score ≥ 0.8: Green (#10b981)
- score 0.5-0.8: Yellow (#fbbf24)
- score < 0.5: Red (#ef4444)
Integration sequence:
# In existing recommendation pipeline
score = confidence_calculator.calculate(...)
explanation = confidence_explainer.explain(score, ...)
display = confidence_presenter.format(score, explanation)
Phase 2B: Critical Transfer - Discussion Example
Team Question (Backend Dev): “Will the penalty calculation be fast enough in production? We generate 1000+ recommendations per request.”
Designer Response: “Good question. The calculation is O(1)—just simple arithmetic. No I/O, no loops. Should be < 1ms per calculation. We can profile in Phase 4 to confirm.”
Plan Revision: Add performance benchmark to Phase 3 tests.
Team Question (Frontend Dev): “For free users, should we hide the confidence score? It could be a premium feature.”
Product Owner Discussion: “Interesting. For MVP, let’s show it to everyone. We can A/B test premium later.”
Plan Revision: None. Noted for future backlog.
Team Question (Senior Dev): “What happens if the external API that calculates similarity is down? Will the confidence score be 0?”
Designer Response: “Exactly. If API is down, no similarity → confidence_calculator returns 0. We need to handle this upstream with fallback or cache.”
Plan Revision: Add error handling to confidence_calculator spec—return 0.0 explicitly if total_similarity ≤ 0, with warning logging.
Final Estimates:
- Designer: “3 simple modules, 6-8h total”
- Team: “With tests and refactoring, more like 8-10h”
- Alignment: 8-10h retained (11% variance, < 20% ✓)
Recommended Prompts
Tactical Plan Generation (Phase 2A)
Generate a detailed tactical implementation plan for this User Story:
USER STORY:
[paste complete User Story with acceptance criteria]
STRATEGIC ARCHITECTURE (context):
[paste relevant Phase 1 ADRs and decisions]
TECHNICAL CONSTRAINTS:
- Stack: Python 3.11+, FastAPI
- Standards: Type hints mandatory, 90%+ test coverage
- Performance: <100ms API endpoint latency
DECOMPOSE into 3-5 components with FOR EACH component:
1. **Component Name** (snake_case)
2. **Responsibility**: One clear sentence of role
3. **Inputs**: Precise types, meaning, constraints
4. **Outputs**: Precise types, format, constraints
5. **Dependencies**: Which other components/services required
6. **Algorithm/Logic**: Main steps (not code, description)
7. **Quality Criteria**: Complexity, performance, testability
THEN:
- **Integration Sequence**: How components assemble
- **Critical Interfaces**: Integration points with existing system
- **Identified Risks**: Technical, performance, dependencies
Format: Structured markdown, clear, unambiguous.
Revision Post-Critical Transfer
Revise this tactical plan incorporating Critical Transfer feedback:
ORIGINAL TACTICAL PLAN:
[paste plan generated in Phase 2A]
TEAM FEEDBACK (Critical Transfer):
[paste discussion notes - questions, concerns, proposed revisions]
DECISIONS MADE:
[paste decisions - what is accepted, rejected, modified]
GENERATE REVISED tactical plan with:
1. Modifications explicitly marked and integrated
2. Responses to concerns documented
3. Additional identified risks added
4. Updated estimates if applicable
Format: Same structure as original plan, with "REVISED:" sections for changes.
Quality Standards
Good Tactical Plan
Characteristics:
- Decoupled components: Each module testable in isolation, minimal dependencies
- Clear interfaces: Explicit inputs/outputs, well-defined contracts
- Logical sequence: Implementation order obvious (dependencies → consuming components)
- Unambiguous specifications: Not vague “handle errors,” but “raise ValueError if x < 0”
- Estimable: Team can estimate effort for each component
Example:
Module: user_validator
Inputs: email: str, age: int
Outputs: ValidationResult(valid: bool, errors: List[str])
Logic:
1. Verify email format (RFC 5322 regex)
2. Verify age in [13, 120]
3. Return result with specific errors
Poor Tactical Plan
Problems:
- Tight coupling: Module A directly calls Module B’s private methods
- Circular dependencies: A depends on B, B depends on A
- Vague specs: “Validate user” without details, “Handle edge cases”
- Incoherent order: Components ordered randomly, not by dependencies
- Impossible to estimate: “User management module” too large/vague
Example:
Module: user_manager
Inputs: user_data (unspecified format)
Outputs: Result (unspecified type)
Logic: Manage users and their data
→ Too vague, impossible to implement
Common Pitfalls
1. Passive Team at Critical Transfer
Problem: Team approves everything without questions. Silence = tacit approval. Designer thinks “everything is clear,” but team is just afraid to question.
Solution:
- Create psychological safety: Designer explicitly says “I WANT your questions, even ‘dumb’ ones”
- Ask direct questions: “Backend Dev, what do you think about external API error handling?”
- Red flag if zero questions: Silent team = problem. Dig into why.
2. Plan Too Detailed (Over-Engineering)
Problem: LLM generates plan with 15 microservices components, complex design patterns, premature abstractions. Team overwhelmed.
Solution:
- 3-5 component rule: Maximum 5 modules for typical user story
- Strict YAGNI: “You Aren’t Gonna Need It”—only what serves this story
- Designer filters: Validates appropriate complexity for problem
Prompt adjustment:
Decompose into 3-5 SIMPLE components.
YAGNI principle: generate ONLY what serves this story.
No premature abstractions, no complex patterns.
Simple code > clever code.
3. Divergent Estimates Not Reconciled
Problem: Designer estimates 6h, Team estimates 15h (150% variance). Moves to Phase 3 without resolving divergence. Sprint planning fails.
Solution:
- Tolerance threshold: 20%: If variance > 20%, STOP and investigate
- Understand why:
- Did Designer miss complexity?
- Did Team misunderstand approach?
- Underestimated technical risks?
- Revise plan: Simplify OR increase time scope
- Never ignore divergence: Symptom of deep misunderstanding
Check Definition of Done #5: “Estimates aligned (variance < 20%)“
4. Unidentified External Dependencies
Problem: Perfect plan but forgets module depends on external API not yet deployed, or data that doesn’t exist in database.
Solution:
- Dependency checklist:
- External APIs (availability, SLA, auth)
- Data sources (DB tables, schemas)
- Internal services (other teams)
- Third-party libraries (version, license)
- Validate BEFORE Phase 3: Identified blockers = pause until resolved
- Fallbacks: If dependency uncertain, prepare mock/stub
Check Definition of Done #6: “All external dependencies identified”
5. Product Owner Absent from Critical Transfer
Problem: PO not present. Team validates technical plan that doesn’t really meet business needs.
Solution:
- PO present minimum 30 min: At start (presentation) and end (validation)
- Explicit business validation: PO confirms “This plan meets the story”
- Fast business decisions: If business question arises, PO decides on the spot
Check Definition of Done #7: “Designer AND Product Owner approve”
Relationship with Agile - Details
Precise Mapping of Agile Concepts → DC²
| Agile Concept | DC² Equivalent | Key Difference |
|---|---|---|
| User Story | Input Phase 1-2 | Story remains at functional user level |
| Story Refinement | Phase 2B (Critical Transfer) | Team revises pre-generated plan vs creates from scratch |
| Sprint Planning | Phase 2B + start Phase 3 | Technical planning already done, just validate + test |
| Tasks | Phase 2 Components | Components = tasks with exhaustive specs |
| Acceptance Criteria | Phase 3 Tests | Criteria become automated executable tests |
| Definition of Done | Per-Phase DoD | Granular DoD per phase, not just story completion |
| Story Points | Hour Estimates Phase 2 | More precise estimates thanks to detailed plan |
Typical 2-Week Sprint Integration
Sprint N-1 (Preparation):
- PO presents User Stories at Product Backlog Refinement
- Designer performs Phase 1 for prioritized stories (architecture)
Sprint N - Day 1 (Monday):
- Morning: Phase 2A (LLM generates tactical plans—30-40 min)
- Afternoon: Team reads plans, prepares questions (30-60 min each)
Sprint N - Day 2 (Tuesday):
- Morning: Phase 2B (Critical Transfer—90-120 min) = Technical Sprint Planning
- Afternoon: Phase 3 (Test Generation—1.5h)
- End of day: Final estimates, commitment
Sprint N - Days 3-10:
- Phases 4-5: Implementation + Refactoring
- Daily standup as usual
- Phase 6 (optional) if component is critical
Sprint N - Final Days:
- PO Demo
- Retrospective
Agile Tools Compatibility
Jira / Azure DevOps:
- User Story stays in backlog
- Phase 2 Components = Story Sub-tasks
- Tactical Plan = attached as document
- Phase 3 Tests = Test Cases linked to story
Jira Example:
User Story: PROJ-123 "Display prediction confidence"
├─ Sub-task: PROJ-124 "Implement confidence_calculator"
├─ Sub-task: PROJ-125 "Implement confidence_explainer"
└─ Sub-task: PROJ-126 "Implement confidence_presenter"
Attachments:
├─ Tactical_Plan_PROJ-123.md (Phase 2)
├─ Architecture_Decision_Confidence.md (Phase 1)
└─ Tests_PROJ-123.py (Phase 3)
Next step: Phase 3: TDD RED - Test Generation →